Irth
29 Case Studies
A Irth Case Study
ChargeEPC, a construction contractor specializing in large-scale energy infrastructure projects, faced significant challenges managing over 1,000 active 811 tickets across multiple states. Their disconnected tools and heavy manual oversight led to increased liability and thousands of unnecessary open tickets. They turned to Irth and implemented its 811spotter platform to regain operational control and reduce risk.
Irth's 811spotter provided a centralized, automated platform for ticket management, offering real-time visibility and mobile access for field crews. As a result, ChargeEPC cut its open 811 ticket volume in half within days, identified and cleaned up over 2,000 legacy tickets, and achieved 100% visibility across its operations, significantly reducing liability and empowering its teams.