Case Study: Lackawanna Energy Center achieves efficient, flexible power generation with Invenergy

A Invenergy Case Study

Preview of the Lackawanna Energy Center Case Study

Lackawanna Energy Center boosts efficiency 60% with Invenergy

The Lackawanna Energy Center, a major natural gas power plant in Pennsylvania, required the development of a large-scale, efficient facility. Invenergy was engaged to bring this project to fruition, leveraging its expertise in managing natural-gas assets. The challenge was to construct a leading-edge plant that could be completed reliably and efficiently.

Invenergy developed the Lackawanna Energy Center, which features an innovative single-shaft turbine design that maximizes efficiency and operational flexibility. The project was completed ahead of schedule and began operations in 2019. The solution implemented by Invenergy resulted in a significant economic impact, with over $285 million invested in the local economy and substantial donations made to community nonprofits. The facility's operations building is also LEED Gold-certified, making it highly energy efficient.


View this case study…

Invenergy

11 Case Studies