InterWorks
135 Case Studies
A InterWorks Case Study
First Bank of Owasso, a community bank serving over 10,000 clients, faced the challenge of modernizing its IT infrastructure to meet increasing demands. They required a solution that would provide extremely high uptime while keeping their servers and information in-house, leading them to partner with InterWorks.
InterWorks engineered a revamped infrastructure centered on a virtualization setup using a Dell EqualLogic SAN and two Dell PowerEdge servers with ESXi in a VMware environment. This solution provided near-instant transfer of processing between hosts for high availability, backed by the Veeam restoration solution. The results for First Bank of Owasso included a dramatic increase in server uptime, much quicker recovery from downtime, and marked improvements in operational efficiency and organization thanks to InterWorks' ongoing desktop support and new workflow management processes.