Hilton San Francisco Airport Bayfront, a busy 15-story, 402-room hospitality property near SFO, was averaging 98% occupancy and needed a more reliable, redundant hot water system. Its existing single steam boiler was costly to replace with another boiler setup, and it lacked the efficiency and backup capacity the hotel required.
Intellihot Inc. installed eight iQ1001s and four iQ751s, delivering 11 million BTU/hr with zero gallons of storage. The solution provided uninterrupted hot water, built-in redundancy, and major efficiency gains, helping Hilton San Francisco Airport Bayfront cut gas bills by 65% over six months while improving performance and space usage.