Case Study: Parkside Pool Apartments achieves lower gas consumption and installation costs with Intellihot iQ1001

A Intellihot Inc. Case Study

Preview of the Parkside Pool Apartments Case Study

Apartment building goes green by replacing an inefficient system with Intellihot

Parkside Pool Apartments, a 100-unit multi-family property in Milwaukee, WI, needed to replace an old boiler and storage tank system that was inefficient, costly to operate, and in need of repairs. The management team wanted a high-efficiency alternative without the complexity of multiple tank-style heaters. Intellihot Inc. provided the iQ series, specifically the iQ1001, as the product used in the project.

Intellihot Inc. installed one iQ1001 with zero storage, delivering a compact, on-demand hot water solution that reduced gas consumption and significantly lowered installation costs through simpler piping and venting connections. The system also helped reduce wasted energy compared with traditional boilers, supporting the property’s efficiency and sustainability goals.


Open case study document...

Intellihot Inc.

46 Case Studies