
Intelex
119 Case Studies
A Intelex Case Study
Entegra owns and operates two of the largest independent power plants in the United States. Both plants, similar in size and design, are natural gas fired combined cycle facilities, each capable of producing approximately 2,200 MW of power and have been in commercial operation since 2003. The Gila River Power Station is located just south of Phoenix, Arizona and the Union Power Station is located in southern Arkansas. Entegra personnel, located onsite at each of the power plant locations, perform power plant operations and maintenance. Entegra is utilizing Intelex’s Business Performance Management System, Safety Meetings Module and iForms System.