Integrate.io
39 Case Studies
A Integrate.io Case Study
Fresno Pacific University faced significant challenges with its legacy ETL provider, including a demand for a costly two-year upfront renewal and arbitrary reclassification of connectors that inflated costs. With shrinking integration needs and a lack of support for key operations, the university needed a more agile and cost-effective data integration solution from a new vendor like Integrate.io.
Integrate.io provided a fast migration, completing the process in under 30 days with zero downtime. The solution included rebuilding SQL and CSV syncs to Salesforce and introducing new capabilities like CSV diffs and joins. As a result, Fresno Pacific University cut its ETL costs by approximately 48%, reduced its integration jobs from over 100 to a manageable set, and gained improved operational control and flexibility for future needs.