Case Study: Morrisons achieves net-zero manufacturing gains with Integrated Environmental Solutions digital twin technology

A Integrated Environmental Solutions Case Study

Preview of the Morrisons Case Study

Morrisons targets 20% energy savings with Integrated Environmental Solutions at Winsford

Morrisons' food production arm, operated by Myton Food Group, faced the challenge of reducing energy use and carbon emissions at its large-scale, 24/7 Winsford food manufacturing facility to meet its commitment to net-zero by 2035. To tackle this, they partnered with Integrated Environmental Solutions to deploy innovative digital twin technology to model the site and inform its decarbonisation pathway.

Integrated Environmental Solutions implemented its IES Virtual Environment and IES Live platforms to create a live performance digital twin of the facility. This solution provided operational insights and forecasted the impact of various energy conservation measures, enabling the identification of cost-effective interventions. The project is projected to achieve significant energy savings, initially targeting 5-20% through quick wins, with further savings anticipated as more measures are implemented, providing a verifiable and actionable net-zero roadmap.


View this case study…

Integrated Environmental Solutions

209 Case Studies