Case Study: Mace Group achieves faster public sector energy modelling with IESVE from Integrated Environmental Solutions

A Integrated Environmental Solutions Case Study

Preview of the Mace Group Case Study

Mace Group reduces model creation time from 2 days to 4 hours with Integrated Environmental Solutions

Mace Group, a global construction and consultancy firm, needed to efficiently perform building performance analyses, including energy assessments, overheating risk, and PV generation calculations, across a high volume of public sector projects. To meet this challenge, they turned to Integrated Environmental Solutions (IES) and its IES Virtual Environment (IESVE) software suite.

Integrated Environmental Solutions provided a deeply integrated suite of applications. Mace used ModelIT to drastically cut geometry creation time from days to hours via Revit import, created reusable building profiles for further time savings, and utilized tools like SunCast and VistaPro for clear client presentations. The solution enabled over 70 projects, slashed modelling time by over 50%, and streamlined reporting for metrics like Energy Use Intensity and overheating compliance, directly supporting carbon reduction goals.


View this case study…

Integrated Environmental Solutions

209 Case Studies