Hoare Lea, a consulting engineering firm, faced the challenge of designing the Botanic Place office development in Cambridge to achieve the highest sustainability certifications, including WELL Core Platinum, BREEAM Outstanding, and high NABERS ratings. To meet this challenge, they utilized the IESVE (Integrated Environmental Solutions Virtual Environment) modeling software to conduct in-depth analysis and optimize the building's design and energy performance.
Integrated Environmental Solutions' IESVE was used to fabricate an intricate energy model and run numerous parametric simulations. This process allowed Hoare Lea to optimize the building fabric, implement a unique mix-mode ventilation strategy to reduce cooling demand, and stress-test the design against future climate scenarios. As a result of this detailed analysis, the design team achieved a nearly 41% reduction in operational energy consumption for key elements like heating, cooling, and lighting from the initial baseline estimate.