Case Study: Griffin Consultants achieves accurate energy savings predictions with Integrated Environmental Solutions (IESVE)

A Integrated Environmental Solutions Case Study

Preview of the Griffin Consultants Case Study

Griffin Consultants - Customer Case Study

Griffin Consultants, working on the Fairmont The Palm Hotel retrofit in Dubai, needed to accurately predict energy savings for a Guaranteed Savings Contract. They used Integrated Environmental Solutions’ IESVE to build a calibrated energy model based on utility bills, BMS data, onsite measurements, and building drawings.

Integrated Environmental Solutions enabled Griffin Consultants to simulate the proposed energy conservation measures and estimate future savings with confidence. The model was calibrated month by month to within 0%–5% of actual performance, and post-implementation results closely matched the predictions, helping support the ESCO’s decision and validate the retrofit approach.


Open case study document...

Griffin Consultants

Hassan Younes

Technical Director & Partner


Integrated Environmental Solutions

64 Case Studies