Fitchburg State University sought to renovate and expand its Science Building to improve energy efficiency. The university enlisted CBT Architects, who utilized performance analysis software from Integrated Environmental Solutions, specifically the IESVE software suite, to guide the sustainable design process.

Using an Integrated Design Process powered by IESVE simulations, CBT Architects collaborated with consultants to analyze costs and performance. This approach, facilitated by Integrated Environmental Solutions, saved $1.5 million in construction costs and achieves $34,000 in annual operating savings, while also helping the project achieve LEED Silver certification.