Integrated Environmental Solutions
209 Case Studies
A Integrated Environmental Solutions Case Study
The customer, CBG Consultants, faced challenges in their BIM workflow when attempting to bring complex architectural Revit models into an analysis environment. Their difficulties included exporting entire building shells from linked models, correcting room volumes, and dealing with import errors. To overcome this, they implemented the IES Revit plug-in from Integrated Environmental Solutions (IES) to improve the integration with the IES Virtual Environment (IESVE).
Integrated Environmental Solutions' tool enabled CBG Consultants to successfully export entire building shells and correct geometry issues within the IESVE's ModelIT. This solution streamlined their modeling process, saving time and allowing their separate Revit and IESVE engineering teams to collaborate more effectively. The biggest gain was the realization of a efficient, BIM-enabled workflow, with specific benefits noted in data transfer and the use of IES's solar analysis tools.