Integrated Environmental Solutions
214 Case Studies
A Integrated Environmental Solutions Case Study
The Penang government collaborated with Universiti Kebangsaan Malaysia on a pilot project for Bertam City, aiming to make it a smart energy city as part of Malaysia's National Low Carbon City Masterplan. Their challenge was to analyze and reduce the city's substantial energy consumption and carbon emissions across an area of 3.6 square kilometers. To tackle this, they worked with vendor Integrated Environmental Solutions, utilizing its IES Digital Twin technology and intelligent Community Design (iCD) tool.
Integrated Environmental Solutions provided a digital replica of the entire city to simulate energy use. The solution involved modeling a baseline and testing strategies like improving building envelopes, upgrading HVAC systems, and calculating solar PV potential. The combined strategies predicted total savings of 69.7% in both energy and carbon emissions, providing a clear roadmap for significant reduction.
Bertam City