Integrated Environmental Solutions
209 Case Studies
A Integrated Environmental Solutions Case Study
The customer, Arup, faced significant interoperability challenges when converting BIM models to analytical models for building design. Their team struggled with a traditional "black box" workflow that oversimplified complex geometries, misaligned surfaces, and was extremely time-consuming, which limited their ability to explore design alternatives. They turned to the vendor, Integrated Environmental Solutions, and its Pollination Revit to IESVE plug-in to address this.
Integrated Environmental Solutions' solution enabled real-time interaction with models during export and direct export to native IESVE .gem files. This transformation of their modelling workflow saved Arup up to 40% in modelling time across over 20 projects. The enhanced interoperability allowed Arup's engineers to focus on optimization and exploring parametric design alternatives, which pushed design decisions toward optimal building performance from the earliest stages.