Instart Logic
26 Case Studies
A Instart Logic Case Study
5th Planet Games, a Rocklin, CA developer of story-driven, content-rich social and mobile titles (including Dawn of the Dragons and Clash of the Dragons), needed faster, more predictable delivery for mobile players. Its legacy CDN forced costly image-management workarounds for many device types, had long cache-clear delays and slow support, and struggled to deliver consistent performance across congested wireless networks and traffic spikes.
After testing, 5th Planet migrated key traffic to Instart Logic with a simple DNS change and gained cloud-based application delivery with automatic image resizing. The switch produced a 10% overall web speed boost (with much larger, visible gains on mobile), removed the need to host multiple image versions, improved scalability and reliability, and provided rapid, engineer-level support that streamlined mobile releases and improved player experience.
David Lease
CTO, 5th Planet Games