The customer, an engineering, procurement, and construction (EPC) contractor for a large gas processing facility, faced significant challenges in multi-disciplinary design coordination. Their clash management process relied on error-prone spreadsheets and uncontrolled model revisions, which caused delays and rework. InStandart was engaged to address these inefficiencies.
InStandart built a centralized 3D model review platform with a smart clash register, version control, and real-time dashboards. This solution slashed the average clash resolution time from 3-5 days to under one day and reduced manual reporting by 87%. Overall, InStandart's platform delivered a 60% improvement in coordination efficiency for the contractor.