NorthC Datacenters deploys 6 MW emergency backup power with Innio Jenbacher

NorthC Datacenters, a European data center operator, required a reliable emergency backup power solution for its Eindhoven facility that aligned with its carbon neutrality goals, moving away from traditional diesel generators. They selected Innio Jenbacher's dual-gas capable "Ready for H2" engines to meet this challenge.

Innio Jenbacher implemented a solution consisting of six containerized Jenbacher engines that provide 6 MW of backup power and can seamlessly switch from natural gas to 100% hydrogen. This allows for a smooth future transition to green hydrogen, supported by on-site storage. The results include a significantly lower carbon footprint and reliable critical infrastructure backup, with performance monitored in real-time via Innio's myplant Performance platform.


View this case study…

Innio Jenbacher

1 Case Studies