InfraBuild
161 Case Studies
A InfraBuild Case Study
The Victorian Government, through its Level Crossing Removal Project, faced the challenge of transforming key transport links in Diggers Rest by removing two level crossings. This required a complex infrastructure upgrade to improve safety and ease congestion. InfraBuild Reinforcing partnered with the construction firm to supply reinforcement solutions for the project's key structures.
InfraBuild implemented a smarter digital supply chain, utilizing digital delivery dockets and improved tracking. The solution included supplying 478 tonnes of 100% locally manufactured steel, with a significant portion prefabricated into cages to speed up installation. This approach, combined with just-in-time delivery coordination, reduced on-site labor, minimized errors and waste, and helped keep the project on its compressed timeline. InfraBuild's contributions supported stronger industry partnerships and demonstrated a more efficient way of working for future projects.