Case Study: Victorian Government achieves smarter, faster level crossing delivery with InfraBuild

A InfraBuild Case Study

Victorian Government removes 2 level crossings with InfraBuild

The Victorian Government, through its Level Crossing Removal Project, faced the challenge of transforming key transport links in Diggers Rest by removing two level crossings. This required a complex infrastructure upgrade to improve safety and ease congestion. InfraBuild Reinforcing partnered with the construction firm to supply reinforcement solutions for the project's key structures.

InfraBuild implemented a smarter digital supply chain, utilizing digital delivery dockets and improved tracking. The solution included supplying 478 tonnes of 100% locally manufactured steel, with a significant portion prefabricated into cages to speed up installation. This approach, combined with just-in-time delivery coordination, reduced on-site labor, minimized errors and waste, and helped keep the project on its compressed timeline. InfraBuild's contributions supported stronger industry partnerships and demonstrated a more efficient way of working for future projects.


View this case study…

InfraBuild

161 Case Studies