Case Study: Tempus Two Winery creates a visually stunning winery with InfraBuild structural steel

A InfraBuild Case Study

Tempus Two Winery creates a dramatic winery with InfraBuild’s structural steel on a 300PLUS site

Tempus Two Winery sought to create a visually stunning, low-maintenance winery that would become a focal point in the Pokolbin region. Their challenge was to build a structure that could cope with the humid vineyard environment without intruding on the horizon. InfraBuild supplied the structural steel that was chosen as the primary structural material for this project.

InfraBuild's structural steel allowed Suters Architects to deliver a dramatic, curved structure that softened into the landscape. The solution met the client's dream of an extraordinary building, achieving a visually stunning result that seamlessly blended with its greenfield site.


View this case study…

InfraBuild

161 Case Studies