Case Study: Salini Impreglio – NRW Joint Venture delivers Forrestfield–Airport Link with InfraBuild reinforcing supply

A InfraBuild Case Study

Salini Impreglio – NRW Joint Venture receives 7,600 tonnes of reinforcing steel with InfraBuild

Salini Impreglio – NRW Joint Venture required a massive and reliable supply of processed and prefabricated reinforcing steel for the construction of Perth's Forrestfield–Airport Link rail project. InfraBuild was engaged to supply this essential material for the project's main dive, station box structures, and egress shafts.

InfraBuild supplied over 7,200 tonnes of prefabricated diaphragm wall cages and 7,600 tonnes of processed reinforcement steel, with a peak production rate of 35 tonnes per day. A key part of their solution was the integration of over 180,000 Griptec mechanical splices. This streamlined supply from local plants ensured consistent progress, helping to deliver a new rail service that will provide efficient access to Perth's eastern suburbs and airport.


View this case study…

InfraBuild

161 Case Studies