InfraBuild
161 Case Studies
A InfraBuild Case Study
Multiplex, the builder for the Australia 108 skyscraper project, required a reliable supply of high-quality steel materials, including prestressing strand and structural steel, for the construction of what would become Australia's tallest building by roof height. The challenge involved sourcing over 800 tonnes of prestressing strand to strict standards and ensuring on-time deliveries to avoid costly construction delays for their post-tensioning specialist, Postenco.
InfraBuild supplied the required prestressing strand, manufactured from Australian-mined iron ore, and provided competitive pricing with flexible delivery scheduling to match the project's timeline. Additionally, InfraBuild supplied and value-added processed the structural steel used to create the building's distinctive 'golden starburst' feature. This double-pronged supply of materials from InfraBuild was instrumental in the successful construction of the iconic 317-meter-tall Melbourne landmark.