Leighton Contractors faced the challenge of constructing 128 heavily reinforced wind tower bases for the Waubra Wind Farm project, a process that was initially very labor and time-intensive when using loose rebar. InfraBuild Construction Solutions supplied its BAMTEC® product to address this challenge.
InfraBuild's solution involved providing pre-assembled BAMTEC® reinforcing carpets, which were planned using sophisticated 3D modeling to ensure constructability. This approach dramatically reduced the construction time for each base by hours and cut the number of men required on the task by half, significantly improving efficiency on the project.