The customer, Geocrete, a precast concrete manufacturer, faced the challenge of meeting a tight construction schedule for the Kwinana Railway Extension Project due to the complexity of the steel fixing required for large, curved reinforcing cages. They engaged InfraBuild Reinforcing for a prefabrication solution to address this challenge.

InfraBuild implemented a solution by prefabricating 600 complex, curved reinforcing cages under controlled factory conditions using a specially designed jig. This allowed them to accurately produce the 11m long by 2m wide cages at a rate of approximately six per day. The solution from InfraBuild successfully enabled Geocrete to meet the project's demanding schedule.