InfraBuild is supplying prefabricated steel cages for the Cross Yarra Partnership, a consortium building the Melbourne Metro Tunnel Project. The challenge was to meet the enormous scale of this project, which required a massive and sustained output of approximately 150 tonnes of fabricated cages per day.
To meet this challenge, InfraBuild dramatically scaled up its operations. The solution involved establishing two additional fabrication sites in Melbourne, increasing their total under-roof workspace from 6,500sqm to 26,000sqm. This expansion allowed InfraBuild to handle the supply of approximately 22,500 tonnes of cages for the project's stations. The result was InfraBuild's successful mobilization for the largest prefabrication project it had ever undertaken in Australia.