InfraBuild
161 Case Studies
A InfraBuild Case Study
The Australian Grand Prix Corporation, along with their project manager Kinhill, faced the challenge of building the track and facilities for the Melbourne Grand Prix within an extremely tight timeframe. A key decision involved choosing between constructing new control and pit buildings or reusing modular ones from Adelaide, with the architects Bates Smart needing a design that was more cost-effective than reassembly. InfraBuild provided a steel-based solution to meet this challenge.
The solution implemented by InfraBuild utilized steel for the construction of the new buildings. This material was selected because it produces light structures with fine details and, most critically, offers an inherent speed of construction that was essential for meeting the project's strict deadline.