Case Study: AMP saves more than $1.6 million on 151 Clarence Street refurbishment with InfraBuild

A InfraBuild Case Study

AMP saves $1.6 million on refurbishment with InfraBuild

AMP, the building owner of 151 Clarence Street in Sydney, faced a major challenge in refurbishing the 1960s-era office tower. The project required specialized fire engineering solutions from vendor InfraBuild to make the extensive interior update economically feasible.

By employing specialized fire engineering techniques, InfraBuild was able to save AMP more than $1.6 million on the refurbishment. This significant cost saving provided by InfraBuild made the entire project viable, successfully taking the building into the next century.


View this case study…
AMP logo

AMP


InfraBuild

161 Case Studies