Case Study: Grosfillex cuts production time and costs and reduces account close to one day with Infor M3

A Infor Case Study

Preview of the Grosfillex Case Study

Grosfillex optimizes processes and reduces costs with Infor M3

Grosfillex, a global designer and manufacturer of institutional and consumer furniture founded in 1927 with production centers in France, the US and Russia, faced the need to cut production time and costs, improve quality-control and material consumption tracking, speed up operational processes and information flows, accelerate account closing, and roll out a single global ERP.

By implementing the Infor M3 ERP solution, Grosfillex significantly reduced manufacturing times and related costs, tightened quality control and material-tracking, streamlined operations and data dissemination enterprise-wide, and shortened account-close time from one week to one day—achieving a single, global ERP and higher satisfaction across the company.


Open case study document...

Grosfillex

Franck Ferreira

Project Manager and Head of Computer Studies, Grosfillex


Infor

327 Case Studies