Incredibuild
45 Case Studies
A Incredibuild Case Study
51WORLD, a digital‑twin and VR specialist founded in 2015, was struggling with very long Unreal Engine 4 build times on Windows that slowed development and raised labor costs for its Earth Clone team. To tackle slow C++ and shader compilations during large‑scale development, 51WORLD selected Incredibuild as an accelerator for faster, distributed builds.
Incredibuild deployed a distributed build solution across about 20 machines (just over 200 CPU cores), cutting UE4 compile time from roughly 60 minutes to about 30 minutes — effectively doubling build speed. More than 30 developers now use Incredibuild, improving quality and time‑to‑market, and 51WORLD praised Incredibuild’s product design and China team support.
Wang Shunji
Head of SOP at Earth Clone Department