Case Study: BlueScope Buildings North America achieves 70% faster CI builds with Incredibuild

A Incredibuild Case Study

Preview of the BlueScope Buildings North America (bbna) Case Study

BlueScope Buildings North America cuts CI build times 70% with Incredibuild

BlueScope Buildings North America (BBNA), a leader in engineering and IT software development, faced a major bottleneck as its codebase grew, with CI build times stretching over four hours. This slowed developer feedback and increased pipeline duration. To address this, the company turned to Incredibuild for its build acceleration solution.

By implementing Incredibuild's distributed build acceleration and build cache within their Windows-based CI/CD pipelines, BBNA maximized existing infrastructure. The results were immediate, achieving a 70% reduction in build time. Incredibuild helped cut overnight CI builds from over four hours to just 71 minutes, enabling faster developer iteration and creating a positive ripple effect across teams like QA.


View this case study…

Incredibuild

72 Case Studies