Case Study: Allseas cuts control system build time from 25 minutes to under 5 with Incredibuild

A Incredibuild Case Study

Preview of the Allseas Case Study

Allseas cuts build time from 25 minutes to under 5 with Incredibuild

Allseas, an offshore contractor specializing in subsea pipelaying and heavy-lifting, faced a challenge in developing its complex Overall Control System. The system, which coordinates thousands of sensors and actuators on its Pioneering Spirit ship, required a code base of over 100,000 lines. With the project on a critical path, the company needed to drastically reduce its 25-minute build times to allow for rapid iterations and changes, especially during expensive offshore commissioning phases.

By implementing Incredibuild, Allseas deployed two acceleration farms to distribute compute power. This solution from Incredibuild cut the control system's build time from 25 minutes to less than 5 minutes. This resulted in a smoother commissioning phase without wasting valuable vessel time and significantly increased the development team's efficiency, leading to safer and more efficient offshore operations.


View this case study…

Incredibuild

72 Case Studies