Case Study: Torxen Energy achieves faster, more secure engineering document management with Idox

A Idox Case Study

Preview of the Torxen Case Study

Driving secure data storage and efficient management of more than 200,000 engineering documents

Torxen Energy, having acquired the Palliser Block in Alberta, Canada, needed to quickly implement a document management solution to handle a rapidly growing volume of inherited engineering drawings and documents. Their existing system was inconsistent, lacked proper revision tracking, and made it difficult to retrieve as-built drawings, creating compliance risks and unnecessary site visits.

Idox provided Torxen Energy with a cloud-based document management system and data migration support, delivered out-of-the-box and fully implemented within three months. The solution migrated more than 200,000 engineering documents, improved search and document visibility across 20,000 locations, and increased daily document processing by 20%, while also reducing the need for costly re-creation of missing drawings.


Open case study document...

Torxen

Tim Houston

Document Control Lead


Idox

40 Case Studies