Torxen Energy, having acquired the Palliser Block in Alberta, Canada, needed to quickly implement a document management solution to handle a rapidly growing volume of inherited engineering drawings and documents. Their existing system was inconsistent, lacked proper revision tracking, and made it difficult to retrieve as-built drawings, creating compliance risks and unnecessary site visits.
Idox provided Torxen Energy with a cloud-based document management system and data migration support, delivered out-of-the-box and fully implemented within three months. The solution migrated more than 200,000 engineering documents, improved search and document visibility across 20,000 locations, and increased daily document processing by 20%, while also reducing the need for costly re-creation of missing drawings.
Tim Houston
Document Control Lead