Case Study: Building Preservation Material Technologies saves 40+ hours per takeoff with Beam AI

A Beam AI Case Study

Preview of the Building Preservation Material Technologies Case Study

BPMT Boosts Estimating Efficiency, Saving 40+ Hours Per Takeoff with Beam AI

Building Preservation Material Technologies (BPMT), a specialty contractor, faced significant inefficiency in its preconstruction process. Relying on entirely manual takeoffs that consumed over 40 hours per estimate, their engineers struggled to find time for accurate cost assessments between site visits, often leading to overbidding. They turned to vendor Beam AI to address these challenges.

Implementing Beam AI’s solution streamlined BPMT's estimating workflow, automating takeoffs to save over 40 man-hours on each one. This allowed engineers to focus on cost analysis and resulted in higher accuracy and more bids submitted per week. The efficiency gains from Beam AI helped BPMT expand its project backlog, ensuring better cash flow and business continuity.


Open case study document...

Building Preservation Material Technologies

Ricardo Pacheco

Chief Technology Officer


Beam AI

33 Case Studies