Hypertherm
50 Case Studies
A Hypertherm Case Study
Doppelmayr, a global manufacturer of ropeway and lift systems, needed to increase manufacturing uptime and improve the efficiency of cutting quality metal parts for its lift towers. Their challenge was to find a more effective method for this critical process while maintaining the high-quality standards required for customer safety.
Hypertherm provided its HPRXD plasma system equipped with the innovative HPR cartridge. This single-piece consumable replaced a complex five-piece stack-up, resulting in faster changeovers, longer consumable life, and lower operating costs. For Doppelmayr, the solution from Hypertherm significantly increased productivity and manufacturing uptime by simplifying consumable management and eliminating errors.
Taylor Jensen
Burn Table Manager