A Hypertherm Case Study
Construction Products, Inc. (CPI), a manufacturer of concrete forming systems, faced a challenge due to dramatic increases in the price of its primary material, mild steel. To maintain profitability, the company needed to find a way to significantly improve its material utilization and operational efficiency.
Hypertherm implemented its ProNest CAD/CAM nesting software as CPI's solution. The software's intuitive interface allowed for a smooth transition and easy operator training. As a result, CPI achieved a 5% savings in material utilization, translating to $50,000 in annual material savings, and streamlined its programming to save an additional $31,000 in labor costs annually, delivering a rapid return on investment.