Case Study: Prolec GE modernizes time and labor management with HRchitect and UKG Pro WFM

A HRchitect Case Study

Preview of the Prolec GE Case Study

Prolec GE modernizes workforce management for 1,100 employees with HRchitect

Prolec GE, a leading transformer manufacturer, faced the challenge of modernizing its time and labor management after its legacy UKG Workforce Central platform was sunset. They needed a new solution, UKG Pro WFM, that could integrate tightly with their SAP ERP system to capture detailed production data and support accurate labor costing without disrupting operations. They partnered with the vendor HRchitect for this migration.

HRchitect implemented UKG Pro WFM in a Big Bang deployment, providing end-to-end services and designing a custom integration with SAP. The solution enabled the seamless, automated flow of time and production data between systems, enhancing reporting accuracy and providing real-time labor insights. HRchitect delivered the project on time and on budget, resulting in a powerful, data-driven environment that supports better control over labor costs and production efficiency for Prolec GE.


View this case study…

HRchitect

71 Case Studies