Case Study: TECO Electric and Machinery Co achieves dramatic performance gains and faster backups with HPE Nimble Storage

A HPE Nimble Storage Case Study

Preview of the TECO Electric and Machinery Co Case Study

Nimble Storage Solution Drives Performance Improvements At TECO

TECO Electric and Machinery’s Singapore arm, which supports subsidiary manufacturing across Southeast Asia, needed to refresh and simplify a complex IT environment running critical apps like SAP and MS‑SQL. During a scheduled hardware refresh the IT team chose to virtualize servers and deploy a Nimble SAN (CS220G and CS210 arrays) to consolidate storage, reduce management overhead and enable replication for disaster recovery.

The Nimble deployment was fast and delivered immediate gains: daily backups fell from almost 13 hours to under two hours using Nimble snapshots, the entire infrastructure is now replicated for DR, SAP response times improved by 60% to about 150 ms and DDIO latency dropped to below 1 ms. The solution also reduced storage maintenance, freed rack space for expansion, and provides proactive monitoring via Nimble’s InfoSight.


Open case study document...

TECO Electric and Machinery Co

Cheong Yew Nam

Head of IT Department


HPE Nimble Storage

78 Case Studies