Case Study: Infraserv Höchst reduces manual effort by 40% with HONICO BatchMan

A HONICO Case Study

Preview of the Infraserv Höchst Case Study

Infraserv Höchst Migration from SAP CPS by Redwood to BatchMan: 40% reduction in manual activities

Infraserv Höchst, operator of the 460-hectare Industriepark Höchst and home to around 90 companies, needed a replacement for the limited, end-of-life free version of SAP CPS by Redwood. The company was looking for a decentralized, on-premise scheduling tool with better SAP integration, alerting, and cost efficiency, while also fitting into its existing landscape and ticketing processes.

HONICO implemented BatchMan to replace CPS, enabling cross-system scheduling, graphical job network management, pre-scheduling validation, and improved reporting and mass changes. The migration was completed on time and on budget, with optimizations to SAP daily and monthly closing processes plus automated POB ticket creation; Infraserv Höchst reports a 30–40% reduction in manual effort and more stable, efficient batch processing with reliable support from HONICO.


Open case study document...

HONICO

18 Case Studies