HOK
15 Case Studies
A HOK Case Study
The customer, LaGuardia Gateway Partners, faced the challenge of redeveloping the outdated Terminal B at LaGuardia Airport into a modern, efficient facility while it remained fully operational, a highly complex aviation endeavor. They engaged vendor HOK for a comprehensive suite of services including architecture, engineering, planning, and sustainable design to achieve this transformation.
HOK implemented an innovative island-and-bridges concept, constructing two new midfield concourses connected to the main terminal by dramatic pedestrian bridges. This solution increased airside capacity by 50%, recaptured 40 acres of land, and shaved two years off the construction schedule, saving millions of dollars. The resulting terminal, which has won numerous awards for design and sustainability, became the first airport globally to achieve LEED v4 Gold certification and has been hailed as ushering in a new era of mobility for New York City.