A Hexagon Case Study
Reia s.r.l., an Italian engineering company specializing in energy systems, faced the challenge of designing a new combined heat and power facility for a paper mill within a strict 12-month schedule. The project was constrained by limited space at an existing site, requiring highly accurate, clash-free 3D models and piping designs that integrated with legacy structures. They turned to vendor Hexagon for a solution using CADWorx Plant Professional and CAESAR II software to achieve this efficiently and without error.
Hexagon's integrated solutions enabled Reia s.r.l. to bi-directionally link 3D design with stress analysis, eliminating the need for manual remodeling and data re-entry. This integration allowed the team to identify and resolve potential over-stress and clash issues early in the design process. The result was a significant improvement in project efficiency and accuracy, ensuring the delivery of high-quality isometric drawings and a fully compliant design that met the client's strict schedule and safety standards.
Christian Pedrielli
Project Manager