Hexagon
971 Case Studies
A Hexagon Case Study
PipeServ Engineering, a Greek engineering firm serving the power and oil and gas industries, was chosen to design a series of combined cycle power plants. This complex project required detailed engineering for piping systems with thousands of supports, pressure vessels, and large-diameter buried pipelines. Their challenge was to efficiently manage this design and analysis work while ensuring high-quality, coordinated deliverables for their client.
Leveraging Hexagon's integrated solutions, including CADWorx Plant Professional, CAESAR II, and PV Elite, PipeServ streamlined its entire workflow. The software's seamless integration accelerated project setup, enabled instant generation of pipe stress models, and automated the production of accurate isometrics and bills of materials. As a result, Hexagon's technology helped PipeServ achieve unprecedented productivity, producing the greatest amount and highest quality of drawings and calculations in the company's history while delivering reliable results to the client in less time.
Antonis Markogianniakis
Chief Executive Officer