Hexagon
971 Case Studies
A Hexagon Case Study
METKA, a major Greek engineering, procurement, and construction company, faced complex design and space limitation challenges while building Greece's largest natural gas power plant. To ensure accuracy and manage these challenges, they turned to Hexagon's solutions, utilizing CADWorx Plant and CAESAR II for the project's design and analysis phases.
By integrating Hexagon's CADWorx for 3D plant design with CAESAR II for stress analysis, METKA streamlined its workflow. This allowed for early error detection and the automatic generation of isometric drawings and bills of material. The solution provided by Hexagon resulted in a significant reduction of man-hours by 30% or more, saving time and reducing expenses for all stakeholders.