A Hexagon Case Study
METKA, a Greek engineering and construction company in the power industry, faced significant challenges with a faulty steam piping design for a new power plant. Manual data entry errors had rendered their model unusable, costing them valuable time and resources. Hexagon provided the solution with its CADWorx Plant Professional and CAESAR II software.
Using the interface between Hexagon's CADWorx and CAESAR II tools, a single engineer was able to efficiently redesign the system and perform accurate stress analysis. This solution from Hexagon enabled METKA to produce an absolutely accurate model, keep the project on schedule, and confidently move forward to the plant's hot commissioning phase.
Nikos Pagkratis
Mechanical Engineer