Case Study: Erdman Anthony reduces rework and project costs with Hexagon CADWorx and CAESAR II

A Hexagon Case Study

Preview of the Erdman Anthony Case Study

Erdman Anthony Chooses Cadworx® And Caesar Ii®, Improving Project Collaboration And Reducing Costs

Erdman Anthony, a multi-disciplinary infrastructure engineering firm, was faced with significant challenges on a large-scale demolition and relocation project for Eastman Kodak. The project involved coordinating work within a vast, 120-year-old plant while ensuring the continuous operation of existing systems, which presented a high risk for costly errors, rework, and budget inaccuracies. To address this, they turned to vendor Hexagon and its CADWorx and CAESAR II solutions.

By implementing Hexagon's software, Erdman Anthony improved team collaboration and enabled a dynamic data exchange between design and analysis. This solution minimized rework, allowed materials to be pre-ordered to avoid price increases, and dramatically improved estimation accuracy. Hexagon's technology helped identify a 50% error in a piping estimate, directly reducing costs and ensuring the project's successful delivery.


Open case study document...

Erdman Anthony

Clint VanDewark

Senior Designer


Hexagon

971 Case Studies