Case Study: Vepica achieves 15% faster fabrication project delivery with Hexagon PPM

A Hexagon PPM Case Study

Vepica speeds fabrication projects by 15% with Hexagon PPM

Vepica, a multinational oil and gas engineering firm, faced significant challenges in designing a fractionation facility for a client. The project involved complex piping and a modular skid design, with teams collaborating across multiple international offices. Effective communication and the avoidance of costly fabrication errors were paramount, especially as the client required a compressed schedule with overlapping engineering and fabrication phases.

Hexagon PPM addressed these challenges with its CADWorx Plant Professional and Isogen solutions. The software provided a centralized database that synchronized the multinational design team's work, minimized errors in bills of materials, and generated accurate piping isometrics. This solution allowed Vepica to complete the project 15 percent faster than estimated, reducing labor hours and greatly satisfying the client.


View this case study…

Hexagon PPM

132 Case Studies