Case Study: Tecnimont achieves faster, cost-effective vessel lifting with Hexagon PPM's PV Elite

A Hexagon PPM Case Study

Preview of the Tecnimont Case Study

Tecnimont Chooses PV Elite to Create Complex Vessels for Petrochemical Expansion

Tecnimont Private Limited, a global EPC company in India, needed to deliver complex vessel and column designs for the Reliance Industries Jamnagar petrochemical expansion under very tight deadlines. The challenge was assembling extremely large, dressed-up vertical columns horizontally and accurately calculating their center of gravity for safe lifting. Tecnimont used Hexagon PPM’s PV Elite® to help tackle this engineering challenge.

With Hexagon PPM’s PV Elite®, Tecnimont modeled internal and external attachments in a single design, calculated the 3D center of gravity for the full assembly, and saved significant time on large equipment design. The solution helped Tecnimont complete the project on schedule, reduce project costs, and achieve successful horizontal assembly and vertical lifts of complex vessels, earning strong client satisfaction.


Open case study document...

Tecnimont

Arpita Shah

Principal Engineer for the Project


Hexagon PPM

92 Case Studies