Case Study: Strategic Projects Inc. Achieves 12% Productivity Gain with Hexagon PPM CADWorx

A Hexagon PPM Case Study

Preview of the Strategic Projects Inc. Case Study

Strategic Projects Inc. (SPI) Realize a 12 Percent Gain in Productivity by Switching to CADWorx

Strategic Projects Inc. (SPI), a Canadian EPCM company serving the oil and gas industry, needed to simplify the workflow between engineering and fabrication while reducing reliance on traditional drawing packages. The company also needed a 3D plant design tool that could produce models usable by multiple third-party fabrication shops without data conversion; it had been using AutoCAD Plant 3D before looking for a better fit. Hexagon PPM’s CADWorx Plant Professional was the product used.

Hexagon PPM helped SPI replace AutoCAD Plant 3D with CADWorx Plant Professional and keep the rest of the software environment largely unchanged, making implementation straightforward. SPI used CADWorx to regenerate specs, validate models against P&IDs, and send native DWG files directly to fabrication, with laser scans improving accuracy on brownfield projects. The result was a 12% reduction in mechanical design and drafting hours, improving both project cost and schedule.


Open case study document...

Hexagon PPM

92 Case Studies