Case Study: STI Engineering achieves 30% engineering man hour savings with Hexagon PPM CADWorx

A Hexagon PPM Case Study

Preview of the STI Engineering Case Study

STI Engineering Designs a Waste-to-energy Plant With Cadworx® & Analysis Solutions

STI Engineering, an Italian design and consulting firm for civil construction and industrial plant projects, won an international tender to design a waste-to-energy plant in the Azores. Facing a complex multidisciplinary project with tight time and cost constraints, the company needed an easy-to-use, quickly deployable solution to improve productivity, support piping design, and generate accurate engineering deliverables. It selected Hexagon PPM’s CADWorx Plant Professional, along with CAESAR II and OrthoGen.

Hexagon PPM implemented CADWorx Plant Professional as the core 3D design platform, enabling fast modeling, interference checking, automatic isometrics and layouts, and bill-of-materials generation integrated with procurement data. The project’s full plant model was completed in just four months, and STI Engineering reported about 30% engineering man-hour savings and roughly 60% lower software costs versus similar previous projects.


Open case study document...

Hexagon PPM

92 Case Studies