Hexagon PPM
132 Case Studies
A Hexagon PPM Case Study
SSTenergomontazh, a Russian engineering company, was challenged to deliver clash-free electrical engineering documentation for an LNG facility while working with multiple incompatible file formats from different 3D design systems. To overcome this and reduce labor costs, they turned to solutions from vendor Hexagon PPM, specifically implementing Intergraph Spoolgen and Intergraph Smart Isometrics.
Hexagon PPM's solutions enabled SSTenergomontazh to efficiently combine and manage the different file types, automate the design process, and ensure a clash-free design. The results included significantly reduced labor costs, major time savings from automated reporting and change management, and the removal of additional costs for data verification. The vendor's tools provided the flexibility and efficiency needed to successfully complete the project.