Hexagon PPM
92 Case Studies
A Hexagon PPM Case Study
Heurtey Petrochem, an international oil and gas engineering group in Romania, needed a better way to create accurate, up-to-date P&IDs and handle heater coil, piping, and skid design for a gas-to-gasoline plant project in Turkmenistan. The company wanted a solution that worked in an AutoCAD environment, offered flexible licensing and affordable pricing, and could support multiple engineering disciplines; it turned to Hexagon PPM and its CADWorx® Plant Professional, CADWorx P&ID Professional, and CAESAR II® tools.
Hexagon PPM implemented a connected workflow for P&IDs, 3D modeling, stress analysis, isometrics, and material extraction across the project, helping Heurtey Petrochem improve engineering accuracy and documentation. As a result, the company reported 50 percent cost savings versus traditional 2D methods for medium-sized projects, along with better efficiency, less time spent on non-engineering tasks, and improved tracking of deadlines and budgets.
Remus Marinescu
Lead Piping Engineer